Q235/Q195/Q345/A36 Hot DIP Galvanized Pipe
In the construction field, galvanized pipes are widely used in piping systems such as water supply, drainage, and heating. For example, it is used in the fields of internal and external structural supports of buildings, bridges, street light poles, road guardrails, transportation facilities, etc.
Features
In the municipal field, galvanized pipes are widely used in sewage, rainwater, tap water and other pipeline systems. Its excellent anti-corrosion properties and durability enable it to work stably for a long time in these situations.
Application
In the industrial field, galvanized pipes are widely used in fluid transportation pipelines in petroleum, chemical industry, electric power and other industries. For example, the chemical industry uses galvanized pipes to transport liquids and gases, and the corrosion resistance of galvanized pipes is crucial in these situations.
Parameters
Product name |
Galvanized Pipe |
Grade | Q235B, SS400, ST37, SS41, A36 etc |
Length | Standard 6m and 12m or as customer requirement |
Width | 600mm-1500mm, according to customer's requirement |
Technical | Hot Dipped Galvanized pipe |
Zinc Coating | 30-275g/m2 |
Application | Wide used in various building structures, bridges, vehicles, bracker, machinery etc. |
Details
1. What are your prices?
Our prices are subject to change depending on supply and other market factors. We will send you an updated price list after your company contact
us for further information.
2. Do you have a minimum order quantity?
Yes, we require all international orders to have an ongoing minimum order quantity. If you are looking to resell but in much smaller quantities, we recommend you check out our website
3. Can you supply the relevant documentation?
Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required.
4. What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 5-20 days after receiving the deposit payment. The lead times become effective when
(1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.
5. What kinds of payment methods do you accept?
30% in advance by T/T, 70% will be before shippment basic on FOB; 30% in advance by T/T, 70% against the copy of BL basic on CIF.