1. Accurate Specifications
Project requirements typically include:
Outer diameter and wall thickness
PSL1 or PSL2 standard
Coating and anti-corrosion treatment
Correct specifications ensure smooth installation and long-term performance.
2. Quality Assurance
Reliable suppliers provide:
Mill Test Certificates (MTC)
Hydrostatic and NDT testing (UT, RT)
Third-party inspection (SGS, BV)
This guarantees product traceability and compliance.
3. Production & Delivery
Pipeline projects require bulk supply and stable timelines:
Fast delivery: 15–35 days
Large-volume production capacity
Consistent quality across batches
4. Export & Logistics
Experienced exporters offer:
FOB, CFR, CIF shipping terms
Delivery to major ports such as Jakarta and Dubai
Full documentation support
This helps reduce delays and simplifies import procedures.