Hot Sale Hot Rolled Carbon Steel Coils Q235 Q345 Q355 S235jr 12mm 16mm Carbon Steel Coils for Industrial Application
|
Product Name |
Hotselling Best Quality A Large Amount Hot Rolled Steel Coil |
|
Material |
Q195/Q235/Q345A36/S235JR/S355JR |
|
Thickness |
0.35 - 200mm |
|
Width |
Width must be ≥ 600mm. Typically, the width ranges from 1000mm to 2500mm, with 6000mm being the most common length. |
|
Standard |
ASTM A53-2007, ASTM A671-2006, ASTM A252-1998, ASTM A450-1996, ASME B36.10M-2004, ASTM A523-1996, BS 1387, BS EN10296, BS |
| 6323, BS 6363, BS EN10219, GB/T 3091-2001, GB/T 13793-1992, GB/T9711 | |
|
Grade |
A53-A369, Q195-Q345, ST35-ST52 ,such as: A36 , SS400 , A572 Gr.50 ,Q195, Q215, Q235, Q345, S355JR |
| Grade A, Grade B, Grade C | |
|
Technique |
Hot rolled |
|
Packing |
Bundle, or with all kinds of colors PVC or as your requirements |
| Key specifications | |
| KS | SS275, SS315, SS410, SS450, SM275A/B, SM355A/B/C/D, SM420A/B/C/D |
| JIS | SS330, SS400, SS490, SS540, SM400A/B, SM490A/B/C, SM490YA/YB, SM520B, SN400B, SN490B |
| ASTM | A36, A283-C, A1011CS Type B, A1011SS Gr.33, A1011SS Gr.40, A1011HS Gr.50, A1011HS Gr.55, A1018HS Gr.50, A1018SS Gr.36 Type2 |
| EN | S235JR, S275JR/J0/J2, S355JR/J0/J2 |
Hot Rolled Coils
| Thickness | 0.35 - 200mm |
| Width | ≥600mm,1000mm -2500mm |
| Grades |
|
Hot Rolled - Pickled & Oiled (HRPO)
| Thickness | 1.6 - 6.0mm |
| Width | 1650mm |
Hot Rolled - Skin Pass Pickled & Oiled (HRSPO)
| Thickness | 1.6 - 2.6mm |
| Width | 1650mm |
1.Fluid / Gas delivery, Steel structure, Construction;
2.ROYAL GROUP ERW/Welded round carbon steel pipes, which with Highest quality and strong supply ability are widely used in Steel structure and Construction.
Note:
1.Free sampling, 100% after-sales quality assurance, Support any payment method;
2.All other specifications of round carbon steel pipes are available according to your requirement (OEM&ODM)! Factory price you will get from ROYAL GROUP.
| Thickness(mm) | 3 | 3.5 | 4 | 4.5 | 5 | 5.5 | customized |
| Width(mm) | 800 | 900 | 950 | 1000 | 1219 | 1000 | customized |
1. Raw Material Preparation: Continuously cast billet (core raw material), surface pretreatment.
2. Defect Removal:
Heating: Walking beam furnace, 1100-1250℃ holding temperature to improve billet plasticity.
3. Rolling:
Roughing: Reversible roughing mill, multi-pass thickness reduction to 20-50mm, width control.
Finishing: Hot continuous rolling mill, thickness reduction to 1.2-20mm, ensuring dimensional accuracy and plate shape.
4. Cooling: Laminar flow cooling system, controlling cooling rate, optimizing steel microstructure and properties.
5. Coiling: Underground coiler, coiling into steel coils and securing them.
6. Inspection and Packaging: Inspecting dimensions, surface quality, and mechanical properties; packaging according to export standards.
I. Core Packaging Standards (Marine Damage Prevention + Compliance Adaptation)
1. Packaging Process (Focus on Corrosion Prevention/Deformation Prevention/Moisture Protection)
Pre-treatment: Clean residual oxide scale from the steel coil surface, ensuring it is free of oil and moisture.
Inner Protection: Wrap 2-3 layers of waterproof film + moisture-proof paper, seal the ports (suitable for high-humidity marine environments).
Reinforcement and Fixing: Bundle with 3-4 high-strength steel straps (uniformly spaced), add rigid protective plates at both ends (to prevent edge compression deformation).
Outer Protection: Wrap the entire surface with wear-resistant woven fabric, add additional anti-collision strips in port lifting areas.
2. Packaging Labeling (Essential for Customs Clearance + Traceability)
Core Information: Material (e.g., A36/SS400), Specifications (thickness × width × weight), Production Date, Net Weight/Gross Weight
Compliance Labeling: CE/ASTM and other international standard certifications, moisture-proof label, lifting warning, country of origin label (adapting to target market customs clearance requirements).
II. Shipment Process (Efficient + Compliant + Risk Management)
1. Loading Plan (Primarily Sea Freight, Adaptable to Container/Bulk Carriers)
Container Loading: 20GP/40HQ customized reinforced, steel coils vertically stacked, gaps filled with cushioning pads (to prevent rolling during transport), single container load ≤ 28 tons.
Bulk Carrier Loading: Anti-slip mats + steel wire rope securing, layered stacking (no more than 3 layers), with reserved ventilation gaps (to prevent condensation and corrosion).
Core Requirements: Centered loading center of gravity, avoiding compression and deformation, compliant with IMO maritime safety standards.
2. Logistics and Customs Clearance (Adaptable to Foreign Trade Compliance)
Logistics Method: Domestic land transport (road/rail) → Port warehousing → Sea freight (direct/transfer), full monitoring of transport temperature/humidity.
Required Customs Clearance Documents: Commercial invoice, packing list, bill of lading, certificate of origin (CO), material certificate (MTC), customs declaration (fumigation certificate may be added depending on the target market). (Certification Documents)
Risk Management: Purchase all-risk marine insurance (covering corrosion, deformation, and loss risks), and confirm the target port's loading and unloading equipment (such as crane load-bearing capacity) in advance.
3. Delivery Guarantee
Packaging complies with ISO 3873 marine packaging standards and is compatible with port loading and unloading specifications in the Americas and Southeast Asia.
Provide full logistics tracking services and confirm the receiving process with customers in advance (including unloading equipment and warehousing condition suggestions).
Support customized packaging (such as special moisture-proof requirements and additional reinforcement) to meet the customs clearance and warehousing needs of different countries.
Transportation: Express (Sample Delivery), Air, Rail, Land, Train, Sea shipping (FCL or LCL or Bulk)
Q: Are u a manufacturer?
A: Yes, we are spiral steel tube manufacturer locates in Daqiuzhuang village, Tianjin city, China
Q: Can I have a trial order only several tons?
A: Of course. We can ship the cargo for u with LCL serivece.(Less container load)
Q: If sample free?
A: Sample free, but the buyer pays for the freight.
Q: Are you gold supplier and do trade assurance?
A: We 13 years gold supplier and accept trade assurance.














