Foundations that respect the line, not fight it.
Our structural engineers iterated on the column grid and footing layout until the independent foundations sat as close to the boundary as the red line allows, maximizing usable warehouse area without encroaching on adjacent land.
Multi-level elevations, handled building by building.
We verified eave and ridge heights for each building against its floor level, and resolved the steel elevation changes where platforms step — so doors, cladding and rooflines stay coordinated across the whole campus.
One drawing set, always in sync.
Because the boundary, elevations, column grid and openings all interact, every revision went through a coordinated check of foundations, main steel, cladding and door positions before anything was released.
Seismic design without the extra tonnage.
Wind and seismic cases were analyzed per local practice, and member sections were tuned so the structure meets seismic requirements with controlled steel weight — no overdesign, no guesswork.